Covering both deep and shallow foundations, this section dictates the installation, tolerance, and testing of: Precast concrete piles Bored piles Steel H-piles Micro-piles
: The most reliable way to obtain the official, unedited version is directly through the JKR official portal or the Cawangan Kontrak & Ukur Bahan (CKUB) portal.
For professionals utilizing the JKR 2020 specification, it must not be treated as a passive shelf document. It plays an active role across the project lifecycle. For Quantity Surveyors (QS)
👇 Save this post or share it with a colleague who needs to stay updated on project compliance! standard specification for building works 2020 jkr pdf
For a project to be compliant, the 2020 specification is typically included as a key contract document in all JKR tenders and contracts. Its practical applications are extensive:
Are you preparing a or resolving an on-site compliance issue ? Share public link
: Sets strict standards for product quality, grades, and sources to ensure consistency across the board. Environmental Protection : Updates include mandatory compliance with Erosion and Sedimentation Control (ESC) and water and air quality standards. Asset Management : New focus areas include Total Asset Management and detailed requirements for as-built drawings. Why This Update Matters Covering both deep and shallow foundations, this section
Installation of damp-proof courses (DPC) and wall ties to prevent moisture ingress. Section F: Roofing Works
This section regulates the use of timber in structural framing, ceiling joists, doors, and cabinetry. It categorizes timber species based on strength groups and durability classes, demanding proper preservative treatments against termite infestation and fungal decay. Section H: Structural Steelwork
: Requirements for optimum moisture content and field density tests. Section C: Piling Works For Quantity Surveyors (QS) 👇 Save this post
: Smoothness tolerances and crack prevention.
This public link is valid for 7 days and shares a thread, including any personal information you added. This link or copies made by others cannot be deleted. If you share with third parties, their policies apply. Can’t copy the link right now. Try again later.
Contractors transitioning from the older 2014 version must pay close attention to several updated domains within the 2020 text:
What is the JKR Standard Specification for Building Works 2020?